Science and Technology › Computing and AI
हिन्दी — Read in HindiSemiconductors, computing hardware and data centres
Semiconductors and computing hardware: India's chip plants and design schemes, the chokepoints in the supply chain, supercomputers and data centres. Prelims has asked where India's semiconductor plants are.
Foundation note: A chip from sand to package: nodes, fabs and the India Semiconductor Mission
Showing 3 of 7 articles, those that changed from 1 to 31 July 2026.Show all
Mobile Phone Manufacturing Scheme
Copy link to Mobile Phone Manufacturing SchemePrelims and Mains
The Mobile Phone Manufacturing Scheme succeeds the production linked incentive for large scale electronics, and pays a share of eligible sales.
- It pays extra for components sourced in India and for Indian brands that design their own products.
What changed
15 Jul 2026New
- The Cabinet approved a ₹62,500 crore scheme for 2026 to 27 to 2030 to 31, after the production linked incentive for large scale electronics ended on 31 March 2026.
PIB, 15 Jul 2026: Cabinet approves Mobile Phone Manufacturing Scheme (MPMS) (opens in a new tab)
Data centres
India's data centre capacity
Copy link to India's data centre capacityPrelims and Mains
A data centre is counted in megawatts of IT load, because uninterrupted power is what it must be given and constant cooling is what that power becomes.
- India's capacity has grown more than fourfold since 2020.
- Data centres gained infrastructure status through the Finance Ministry's Harmonised List in 2022 to 2023, which opens them to cheaper and longer term lending.
What changed
9 Jul 2026BriefGujarat notified India's first State data centre policy, for 2026 to 29, with support for captive desalination plants. The Hindu, 9 Jul 2026: 'Data centre capacity to jump to 12 GW as AI fuels demand' (opens in a new tab)
Show history (1 other update)
11 Jun 2026
- Two Adani data centres for the Google Adani hub in Andhra Pradesh were cleared within nine days as category B projects.
- A category B project needs no public hearing when its built up area is under 1,50,000 sq m, and both sites sit just under it.
- A petition before the National Green Tribunal challenges the clearances.
Mains: The Environment Impact Assessment (EIA) Notification, 2006 predates hyperscale data centres and lets them be appraised as buildings; critics argue for category A where sites lie within 10 km of protected or critically polluted areas.
Frontline, 11 Jun 2026: Is Andhra Pradesh's data centre push a recipe for disaster? (opens in a new tab) · The Hindu, 5 Jun 2026: AI to double data centre power and water consumption by 2030, UN researchers say (opens in a new tab)
Data centres: water, cooling and siting
Copy link to Data centres: water, cooling and sitingPrelims and Mains
- Power Usage Effectiveness
- Total electricity a data centre uses divided by the electricity its IT equipment uses; a value closer to 1 means greater efficiency.
Data centres are cooled by carrying their heat away with water, which makes cooling the demand that meets a local limit first.
Water and efficiency
- A 100 MW data centre uses about 2 million litres of water a day; a conversation of 20 to 50 exchanges with a chatbot uses about half a litre.
- The Bureau of Indian Standards measures a data centre by Power Usage Effectiveness: total electricity used divided by the electricity its IT equipment uses.
- It also measures Carbon Usage Effectiveness, the Cooling Efficiency Ratio and Water Usage Effectiveness.
- The building must meet the Energy Conservation Building Code 2017 and the Energy Conservation and Sustainable Building Code 2024.
- Direct to chip liquid cooling, adiabatic cooling and immersion cooling bring the ratios down.
Clearance and siting
- Environmental clearance is needed only where a data centre forms part of a building project over 20,000 sq m or a township, and it is granted by the State Environment Impact Assessment Authority.
- State incentive packages ask for neither a water disclosure nor a grid impact assessment, so the clustering has been towards States already short of water.
What changed
26 Jul 2026
- Residents of Thane protested against a hyperscale data centre needing about 422 MW of continuous power, in a city already short of water by 40 million litres a day.
- In Visakhapatnam and Anakapalli, land allotted for a 1 GW hub drew objections over water, power and nearby forest.
- Maharashtra cut the green energy requirement for such projects from 100 to 51 per cent in June 2026.
The Hindu, 26 Jul 2026: Why are mega data centre projects facing stiff resistance? (opens in a new tab) · Frontline, 7 Aug 2026: A residents' campaign against a hyperscale data centre inside Thane city has turned data centre siting into a mainstream environmental dispute in Maharashtra, with water, power and heat as the contested grounds. (opens in a new tab) · The Indian Express, 23 Jul 2026: Data centre construction is being halted abroad over power, water and local costs, as India expands its own (opens in a new tab)
Background reading: PIB, 14 Sep 2026: Data Centres in India: Infrastructure for the Digital Age (opens in a new tab)
- Fabless
- A company that designs and sells chips but outsources their manufacture to a foundry.
- ATMP/OSAT
- Assembly, testing, marking and packaging (ATMP), or outsourced semiconductor assembly and test (OSAT): the stage that turns fabricated wafers into finished chips.
- Compound semiconductor
- A semiconductor made of two or more elements, such as gallium nitride, used in power, radio frequency and optical devices.
- CoWoS
- Chip on wafer on substrate, TSMC's advanced packaging technology.
- Interposer
- A silicon layer holding several chips side by side and carrying signals between them.
Also filed elsewhere
- Photonics · on Satellite and emerging communications
Photonics is the technology of the parts that carry a signal as light rather than as current, where India's chip policy meets its network hardware.